HORNBY - BR (Late) - Thompson Class A2-3 - 60521 'Watling Street' Steam - R30394

  • £251.99
    Unit price per 
Tax included. Shipping calculated at checkout.


The elegant Thompson Class has arrived at Hornby. This OO gauge locomotive features sprung metal buffers and NEM couplings, and is easily upgraded to HM7000 control by adding a 21-pin decoder (sold separately).

History

Of the 15 newly built A2s, only the first, No. 500, emerged from Doncaster under Edward Thompson while he was Chief Mechanical Engineer. That was in May 1946 and, by the end of the following month, Thompson had retired aged 65. 

The remaining 14 were built under his successor, Arthur Peppercorn, between July 1946 and September 1947. They had planned to build 25 in total, but Peppercorn cancelled the remainder while he made modifications to the design. 

His new design became the A2 and the Thompson locomotives were designated A2/3s. No. 60521 entered service as No. 521 ‘Watling Street’ at Gateshead in May 1947 and was withdrawn by BR at Tweedmouth in November 1962.

What's Inside

1x Model Steam Locomotive, 1x Accessory Pack (includes drain cocks, vacuum pipes, front steps and flanged pony truck wheelset), 1x Instructions